- Last deck section with Kevlar and epoxy
- Last deck section clamped
- Stern deck tabs in place
- Bow deck tabs done and sanded
- Deck Sanded and ready to go
- Crumpled deck now ready to go
- Deck still fits and ready to be glued back in place
- Both Sides of Deck Seam Sanded
- Glued and 4 Rolls of Electrical Tape
- Giant Flag at the Start
- Flag Selfie
- Starting Cannon
- East Moline Downtown
- Bandstand
- Erynn at the Start
- Start Selfie
- Starting Corral
- Queuing to Start
- Crossing the Start Line
- Finisher Medals1
- Finisher Medals2
- Erynn and Greta peeling back electrical tape
- Ready to join deck and fix some cracks in top of deck
- Kevlar Epoxy and Wax Paper on Deck Seam
- Electrical tape to deck seam
- Deck seam and half of deck cracks clamped
- Result of repair to deck seams and first half of cracks
- Second half of top deck cracks sanded
- Clamping repair of second half of top deck cracks
- Band Aid for The Ely
- 65925133-B3E1-4247-B25F-0C4FE366D02C
- Towel Drying
- Deck Structural Repair Finished
- Ely dent repaired
- Deck top completely sanded
- Deck Slathered in Bondo
- Deck Bondo Sanded - 1st application
- Deck Bondo touch up - 2nd application
- Front Desk - Bass Street YMCA
- Coach and Cox Meeting
- Beckwith Boathouse1
- Y Quad Cities Rowing Camp
- Beckwith Boathouse2
- DAR 9712
- DAR 9713
- DAR 9714
- JB Smooth
- Race Organizer Danelle and Erynn
- DAR 9717
- DAR 9719