June 2015
tackling our biggest project to date
tackling our biggest project to date

Before and After1
Before and After2- Before1
- Before2
- Glass removed and chipping Tile
- Tile gone
- Durarock gone
- Water damage from leaky shower
- Greta vacuuming1
- Greta vacuuming2
- Tub surround gone1
- Tub surround gone2
- Shower base gone
- Shower valve re-built
- Vanity before demo
- Sink off
- Sink off1
- Scavenger excited to find the hidden copper
- Vanities out
- Toilet out
- Underlayment removed
- Clean Slate1
- Clean Slate2
- Erynn standing by our pile on bulk pick up day - somone already scavenged the sink
- Sub Floor repaired under toilet and shower
- Insulation in
- Plastic over insulation
- Prepping bottom of vanities to cut 2 inches off - needed to fit vanity top
- Replacing plasctic stapled corner brackets with steel ones
- Prepping vanity install
- Vanities installed
- Linen cabinet installed
- Onyx Collection sink
- Cutting 1 inch off width
- Vanity top installed
- Faucets installed
- Cabinet Doors Installed
- Shower Drain Replaced and Moved
- Shower Pan Fits
- Doug and his dad building the tub frame
- Dry Fit the New Soaker Tub
- Dad helping out
- Tub Side Supports In
- Shower Pan Glued in and Drain Ready for Final Assembly
- Dry Fit the Tub One More Time
- Erynn Checking Things Out1
- Erynn Checking Things Out2
- Bathtub framing complete
- Making the corner secure with a threaded rod
- Corner secure
